Factory-direct · MOQ 500 Free design · Free tooling Sample kits air-freighted worldwide · 5–8 days
Home/About
About

We are the factory.
That is the whole pitch.

Not a trading company, not an agent, not a marketplace listing. The building, the machines and the people who make your items.

Most guest amenity suppliers sit three steps from the production line. We are one step from it — which is why the price is what it is, and why you can talk to the person who runs your order.

Guestsake factory building exterior
16
Years making these items
3,800 m²
Factory floor
86
People on site
19
Countries shipped to
How this started

Started with a complaint we could not answer.

The business started with a complaint we could not answer. A hotel in Columbus kept sending pens back — not because they were faulty, but because the logo wore off within a month of a guest putting one in a pocket. The supplier said it was a decoration problem.

It was not. It was a plating problem, and nobody in the chain was close enough to the machine to see it. That was the whole reason to be a factory rather than a middleman: you can walk to the bench and look.

The first order was 500 brass pens for a 42-room property on the edge of the city. They cost more per unit than what the hotel had been buying, and the general manager agreed to try them for one season. That property is still a customer.

What has not changed is the answer we give when something goes wrong: what happened, in the order it happened, including the part that was our fault.

The original workshop with hand tools and sample shelves
Timeline

How we got to eight categories.

Four moments that changed what we could make, and who we could sell it to.

2010
Two people, one machine
Started as a workshop doing logo work for promotional distributors, not hotels.
2015
First hotel account
A 42-room property in Ohio ordered 500 brass pens and never went back to plastic.
2019
Production brought in-house
Plating, pad printing and assembly moved onto our own floor instead of being subcontracted.
2024
Air freight as standard
Sample and urgent orders moved to air, so a hotel can hold the item in under two weeks.
Inside the factory

Where the items are actually made.

Four photographs, shot on the floor rather than styled. Buyers look at these more carefully than they look at the product shots.

Assembly workstations on the production floor
Assembly workstations on the production floor
Laser engraving station marking a metal plate
Laser engraving station marking a metal plate
Quality control bench with colour swatches and calipers
Quality control bench with colour swatches and calipers
Packed cartons on pallets in the dispatch area
Packed cartons on pallets in the dispatch area
Who you work with

Three names, not a contact form.

A hotel buying 500 pens should know who is answering the email.

Jian Chen
Jian Chen
Founder
Ran the first engraving machine in 2010. Still signs off every new tooling job before it reaches the floor.
Min Li
Min Li
Production & QC
Twelve years on the floor. Runs the colour-matching bench and signs every batch record that leaves the building.
Siwon Wang
Siwon Wang
Export & logistics
Handles freight, documents and the four-hour quote queue. The person who answers your email.

What we actually do

We design and manufacture eight categories of branded take-home items for hotels — pens, keychains, luggage tags, fridge magnets, tote bags, toiletry bags, coasters and compact mirrors.

We sell them two ways: as pre-priced programmes for hotels, and as bulk lines for distributors. Both come off the same production line.

We keep buffer stock of core components at the factory, so a reorder does not wait for a new production run.

What we do not do

We do not do 3,000 SKUs. Eight categories is the range, and it stays at eight — a supplier that says yes to everything cannot be good at anything.

We do not sell through marketplaces. If you find these products on Amazon under another name, they are not ours.

We do not promise five-day delivery on custom work. Production is 12–30 days and we will tell you that up front.

8
Categories, permanently
12–30
Days production, quoted honestly
5–8
Days air freight to most markets
Compliance

The paperwork hotels ask for.

FDA declaration of compliance for food-contact materials. Ink migration and continuous-writing test reports. Batch colour-difference records to ΔE ≤ 1.5. Everything a procurement team will ask for, already on file.

Start with a sample kit.

Three items, one engraved with your logo, air-freighted from China in 5–8 days.

Request sample kit
WhatsApp